C-200Core Services

Fourteen scopes.
One contract.

The construction scopes below are self-performed by SDF crews on SDF equipment. No broker layers, no subcontract chains — one accountable team from notice to proceed through final acceptance.

C-201

Mass Earthwork

Million-yard cut/fill programs executed on GPS machine control.

Large-scale cut, fill, and haul operations sequenced around your critical path. Our GPS-controlled fleet moves earth at production rates most contractors subcontract out — we self-perform all of it.

  • Cut / fill balancing
  • Mass haul optimization
  • GPS machine control
  • Moisture conditioning
  • Compaction to spec
Photo Plate · Mass Earthwork
FIG. C-201
C-101

Site Development

Turnkey sitework from raw land to pad certification.

One contract, one mobilization, one accountable team from first survey stake to certified building pad. We deliver sites ready for vertical construction on schedule-critical programs.

  • Pad preparation & certification
  • Building pad delivery
  • Site logistics planning
  • Phased turnover
  • Survey control
Photo Plate · Site Development
FIG. C-101
C-102

Land Clearing

High-production clearing and grubbing at any acreage.

Forestry mulchers, dozers, and excavators clear right-of-way and greenfield sites at production rates measured in acres per day, with full debris management and permitted disposal.

  • Clearing & grubbing
  • Mulching & chipping
  • Right-of-way clearing
  • Debris hauling
  • Permitted disposal
Photo Plate · Land Clearing
FIG. C-102
C-202

Excavation

Structural, bulk, and precision excavation to exact grade.

From deep structural excavations with engineered shoring to bulk cuts measured in hundreds of thousands of yards, we excavate to tolerance and keep spoil moving off the critical path.

  • Structural excavation
  • Trench shoring & safety
  • Rock excavation
  • Dewatering coordination
  • Spoil management
Photo Plate · Excavation
FIG. C-202
C-203

Rough & Fine Grading

Machine-control grading to a hundredth of a foot.

3D model-driven grading with automated blade control delivers finished surfaces that pass on the first inspection — subgrades, slopes, ponds, and pads held to a hundredth.

  • 3D model buildout
  • Automated blade control
  • Subgrade preparation
  • Slope & pond grading
  • Final acceptance surveys
Photo Plate · Rough & Fine Grading
FIG. C-203
U-301

Underground Utilities

Complete wet and dry utility systems, self-performed.

Water, sanitary, storm, and joint-trench dry utilities installed by dedicated crews with our own trench boxes, shoring, and pipe-handling equipment. Tested, chlorinated, televised, and accepted.

  • Wet & dry utility systems
  • Joint trench
  • Deep utility installation
  • Testing & acceptance
  • As-built documentation
Photo Plate · Underground Utilities
FIG. U-301
U-302

Storm Drain Installation

RCP, box culvert, and detention systems at production scale.

From 18-inch laterals to 12-foot box culvert and underground detention systems, our storm crews set pipe at rates that keep mass grading unblocked behind them.

  • RCP & HDPE mains
  • Box culverts
  • Underground detention
  • Inlets & junction structures
  • Outfall structures
Photo Plate · Storm Drain Installation
FIG. U-302
U-303

Water & Sewer

Potable water and sanitary systems from main to meter.

Pressure mains, gravity sewer, lift stations, and service connections installed, tested, and accepted under one self-performing crew structure — no handoffs, no finger-pointing.

  • Water distribution mains
  • Gravity & force main sewer
  • Lift stations
  • Fire loops & hydrants
  • Bacteriological testing
Photo Plate · Water & Sewer
FIG. U-303
S-401

Concrete

Structural and site concrete placed by in-house crews.

Foundations, paving, drainage structures, and flatwork placed by SDF crews on SDF schedule — the concrete package stays inside the same accountability structure as the dirt.

  • Foundations & footings
  • Site paving
  • Curb & gutter
  • Drainage structures
  • Equipment pads
Photo Plate · Concrete
FIG. S-401
R-501

Road Construction

Haul roads, public roadways, and heavy-duty pavements.

Subgrade through surface: stabilization, flexible base, asphalt and concrete paving for public roadways, industrial access, and mission-critical haul routes built to survive the loads we put on them.

  • Subgrade stabilization
  • Flexible base
  • Asphalt & concrete paving
  • Haul road programs
  • Striping & signage
Photo Plate · Road Construction
FIG. R-501
D-601

Demolition

Structural and site demolition with full material recovery.

High-reach excavators, shears, and crushers take structures down and turn them into usable base material on site — demolition sequenced directly into the earthwork that follows it.

  • Structural demolition
  • Slab & foundation removal
  • On-site crushing & recycling
  • Hazard abatement coordination
  • Clean site turnover
Photo Plate · Demolition
FIG. D-601
E-701

Erosion Control

SWPPP compliance managed as a production discipline.

Stormwater compliance handled by dedicated crews with weekly inspection cadence — silt fence, inlet protection, stabilized entrances, hydromulch, and documentation that survives an audit.

  • SWPPP implementation
  • Inspection & reporting
  • Hydromulch & seeding
  • Sediment basins
  • Final stabilization
Photo Plate · Erosion Control
FIG. E-701
Q-801

Equipment Rental

Fleet-grade iron, bare or operated, from our own yard.

A company-owned fleet means surplus capacity you can rent — late-model, dealer-maintained iron with operators available, mobilized from our yards, not a rental counter.

  • Bare & operated rental
  • Long-term project fleets
  • GPS-equipped machines
  • On-site service support
  • Rapid swap-outs
Photo Plate · Equipment Rental
FIG. Q-801
X-901

Emergency Response

24/7 mobilization for failures, floods, and disasters.

Washouts, utility failures, storm damage, disaster recovery — we mobilize crews and iron within hours, not days, because the equipment is ours and the people are on payroll.

  • 24/7 dispatch
  • Disaster recovery
  • Emergency utility repair
  • Flood & washout response
  • Government & municipal support
Photo Plate · Emergency Response
FIG. X-901
U-300Underground Utilities

What good work
looks like below grade

Every trench we open follows the same discipline: engineered protection, proper bedding, exact line and grade, and compacted lifts closed over tested pipe. Scroll the section — this is the sequence.

TYP. UTILITY TRENCH SECTION · N.T.S.STORM 36" RCPSAN 12" PVCWATER 8" DIP10'-0" ± GRADE RESTORED

Need a scope that isn't listed? If it moves earth or goes below grade, we've built it.

Request Bid
We Don't Compete. We Perform.

Final Sheet · G-999 · General Notes

Let's build something that lasts.

Send us the plans. Within days you'll have a hard number, a mobilization date, and a team that treats your schedule like a contract — because it is one.